At the utility facility - the main sewage pumping station of Sudogda (hereinafter – GKNS) – an energy saving measure was implemented according to the energy service contract model.
A solar grid power plant with an installed capacity of 6.72 kW (hereinafter referred to as SES) is installed on the roof of the GKNS building. The solar power plant is connected to the internal network of the GKNS without electricity supply to the external distribution network.
The output of electricity produced by the power plant is carried out at a voltage level of 380 V. The electricity produced by the solar power plant is consumed by the GKNS electric receivers.
An energy service contract has been concluded with the organization operating the GKNS.
During the term of the energy service contract, the savings received will be paid to the energy service company by the operating organization. Savings are defined as the consumption of electricity produced by the solar power plant by the electric receivers of the object. After the expiration of the contract, the solar power plant will be transferred to the balance of the utility company.
This project is a participant in the program of state support for energy saving projects implemented by the Government of the Vladimir region.
Thanks to this program, the energy service company has the opportunity to receive a subsidy in order to reimburse part of the costs of the purchased energy-efficient equipment, which significantly reduces the validity period of the energy service contract.
For all questions regarding the implementation of energy service contracts, you can contact the project manager: Dmitry Burykin, tel. +7-918-44-000-59, dmitry@eurosolarrussia.org